May 2006 – Removing the Floors plus Frame Welding


Warning: file_exists(): open_basedir restriction in effect. File(\28) is not within the allowed path(s): (G:/PleskVhosts//attackbanana.com\;C:\Windows\Temp\) in G:\PleskVhosts\attackbanana.com\httpdocs\wp-content\plugins\gallery-by-supsystic\src\GridGallery\Galleries\Module.php on line 314

Continuing on towards having the midget rolling again, time to cut out the floor to make room for the frame.

Also known as: Brownie bought a plasma cutter.

I have a ways to go. Some of the cuts are rough, and need to be ground out so the frame will fit. I also cut too much in a few spots, and have to figure out how to reconcile that. But it’s another step forward.

That last comment was done on saturday. I just added 32 through 36 on monday (Memorial Day) when I did more work. I still need to weld it in front and back, but it’s fully in on the sides. My first real welding, and I think I did alright. My dad got me started with tacks, and instructions, but I probably did 80% of it.

<-- Back